Interchange X2-RN9-Liaison Nord/Sud - Boulevard B

Customer

Ministère de l'équipement, de l'habitat et de l'aménagement du territoire - DGPC

Location

Tunisia (Tunis)

Period

novembre 2016, en cours

Description of the project

The development of the interchange consists mainly of :
– Raising the axis of the X2 with the help of a viaduct (approximately 520 metres long) spanning
the RN9, the RN8 and the ONAS canal and connecting with Boulevard B ;
– Install a roundabout at the X2-Boulevard B intersection;
– Install a roundabout on the RN9 at the cemetery;
– All movements are drained by loops and entry/exit ramps.

SETTING services

Approval of the execution studies;
Monitoring, follow-up and technical assistance