Jacqueville Bridge in Côte d’ivoire

Conutry : Côte d’ivoire
Date : 2010
MAÎTRE D’OUVRAGE : AGEROUTE
ENTREPRISE : Arab Contractors (Egypte)

SETTING has carried out the execution studies of the bridge.

MAIN CHARACTERISTICS :

  • 570 m long prestressed concrete beam bridge with 15 spans of 38.10 m each
  • Width of wheels: 7.5 m
  • 25.6 million Euros

 

 

error: Contenu protégé !!